Boilerhouse Resilience, Royal Group of Hospitals, Belfast

Client:       Belfast Health and Social Care Trust

Complete: November 2013

Value:       £9.8m

 

The existing Central Boilerhouse serving the entire Royal Group of Hospitals complex had exceeded its usable life expectancy and was due for replacement. IN2’s design for the phased refurbishment of the existing boilerhouse into a modern Energy Centre  led the BHSCT to appoint IN2 as lead consultant and project managers.

The redevelopment of the Boilerhouse took place in 3 No. distinct phases. IN2’s phased design took account of contingency arrangements for the Trust’s critical-care buildings. Each phase was self-contained and modular in its design approach. The “energy security” and back-up requirements of the RGH Site was maintained throughout each phase.

Downloads

Dublin

Unit B Mount Pleasant Business Centre

Upper Mount Pleasant Avenue, Dublin D06 X7P8

t: +353 (0)1 496 0900

e: info@in2.ie

© 2017 IN2 Engineering Design Partnership  |  All Rights Reserved

Belfast

52 Elmwood Avenue

Belfast BT9 6AZ

t: +44 (0)28 9022 1110

e: info@in2engineering.com

Athlone

14 O'Connell Street

Athlone, Co. Westmeath N37 Y7D9

t: +353 (0)90 640 9090

e: info@in2.ie

London

Unit 31 Waterside

44-48 Wharf Road, London N1 7UX

t: +44 (0)20 3582 8852

e: info@in2engineering.com