Delivery Suite Ventilation Upgrade, Cavan General Hospital

Client:       HSE

Complete: February 2014

Value:       €170,000

 

The existing delivery suites in the Maternity Department at Cavan General Hospital were not in compliance with HTM 03-01 and HBN 26. IN2 were appointed by the hospital as lead consultant for the upgrade of and complete replacement of the existing central Ventilation system serving 4 No. delivery suites.

The design solution for the project ensured that maximum energy efficiencies were achieved. IN2’s “simplicity of design” ensured that the engineering infrastructure for the delivery suites was sustainably delivered, and effectively managed, in line with the long term strategic direction of the HSE.

Downloads

Dublin

Unit B Mount Pleasant Business Centre

Upper Mount Pleasant Avenue, Dublin D06 X7P8

t: +353 (0)1 496 0900

e: info@in2.ie

© 2016 IN2 Engineering Design Partnership  |  All Rights Reserved

Belfast

52 Elmwood Avenue

Belfast BT9 6AZ

t: +44 (0)28 9022 1110

e: info@in2engineering.com

Athlone

14 O'Connell Street

Athlone, Co. Westmeath N37 Y7D9

t: +353 (0)90 640 9090

e: info@in2.ie

London

Unit 31 Waterside

44-48 Wharf Road, London N1 7UX

t: +44 (0)20 3582 8852

e: info@in2engineering.com