The Alternative Workplace – Covid-19 Risk Mitigation

The Alternative Workplace – Covid-19 Risk Mitigation

In these unprecedented times, we all contemplate how the office work life will change to facilitate a safe working environment for its users. At IN2 we have been working with various clients, researching how our workplaces must adapt to promote the safety and comfort...
Approval for East Wall Road PRS

Approval for East Wall Road PRS

Fast-track planning has been approved by An Bord Pleanála for the €74M East Wall Road residential scheme. An Bord Pleanála has given the go-ahead for the East Wall Residential Scheme situated on the corner of East Wall Road and Merchants Road within Dublin’s...
Renewable Designs for Low Energy Buildings

Renewable Designs for Low Energy Buildings

At IN2 we develop innovative sustainable engineering solutions with passive design and building simulation techniques integral to our approach. Here’s an example of renewable designs for low energy buildings we offer in the video below. If you have any questions or...
Ventilation Design – Covid-19 Risk Mitigation

Ventilation Design – Covid-19 Risk Mitigation

Covid-19 is still not entirely understood, in particular the way it spreads indoors through airborne micro-droplets (aerosol spread). However, in recent months IN2 have considered and adopted ventilation design proposals based on sound fundamental principles for our...
Approval Granted for Airton Road, Tallaght

Approval Granted for Airton Road, Tallaght

Fast-track SHD planning has been approved by An Bord Pleanála for Airton Road Airton Road is a major residential project located in suburban Dublin proposed to bring over 500 apartment units to the former Gallaher cigarette factory site in Tallaght, Dublin 24....